5 tons of safe lifting coordinates.(B) the cranes used to test the weight of 1.25 times the actual weight.Maximum overload safely without lifting as In case there are no coordinates excluding the safe manufacturer.Assigned to weight-based tests that engineers determinedWeight lifting tests may be used to test the actual weight or the weight test.Simulation (Simulation Load).(Ii) the size and diameter measurements, use a tool to measure the resolution of not less than.0.1 mm.(3), welding inspection, performed by the detection method to examine visually, or by another method.The appropriateClause 6 the employer must provide the documents list the components and test equipment for.The crane there by mechanical engineer who is the certification of engineers while testing photos and a copy of the license.Professional engineering controls and stored as evidence, the labour inspection staff monitor.Article 7 the employer must follow the text instructions. How to fix the fault, structural or?The components of the crane in part or in whole, or imperfections engineering, according to the recording.Our test engineers
翻訳されて、しばらくお待ちください..
