4.1.1 reviewing the original study
The consultant will have to review the report associated with the project. As well as other reports The master plan projects involving bridge across the Chao Phraya River in Bangkok and its vicinity, as well as the Cabinet Advisor to the regulations and plans to have concluded a study on various issues. Involved in the report clearly
4.1.2 of economic and social
studies, economic 4.1.2.1.
Consultants to study And analyze the national, provincial and local level, the influence of the project. This information will be gathered and analyzed in town. Information, land use planning, including population, income, car registration, the gross domestic product, employment, economic branches. The project is affected by agriculture, industry, trade and tourism, education, public administration, as well as support the development opportunities of influence of the project. The information must be secondary in the last study
in social studies 4.1.2.2.
Consultants to study social change in the area of influence of the project, such as population, education, health, governance, etc. The emphasis on the macro-level changes in the past and the future. And to conduct a study to support a study on the environmental impact of social factors on the micro level with
4.1.2.3 studies and trend analysis of the economic and social future.
Consultant to study the economic and social trends. In order to analyze the traffic, and more. As discussed in Section 4.1.2.2
4.1.3 of the Traffic and Transport
4.1.3.1 for collecting and analyzing data.
Consultants are needed to collect and analyze data traffic and transport as well as network communications involving both past, present and future.