2.3.3 management plan, Government plan soil.From seminars to study the preparation plan for bridge across the Chao Phraya River in Bangkok and vicinity for no. 1 that the Transport Ministry had prepared a plan for the bridge across the Chao Phraya River in Bangkok. Presently, there are a total of 22 bridge Chao Phraya River Bridge, the Phantom, which current consumption flow of up to 2.7 million cars a day and tomorrow another 10 years ahead is the year 2564 would be expanded to 3.6 million a day, which, in future, require additional cooling for bridge construction traffic, more agile 15 projects to bridge the train car was 4 and 2 special project, which is in the responsibility of the Ministry of transportation and the BMA.Both these The current journey across the River, there are only 10 kilometres per hour speed only, especially in the outer parts of Bangkok are just 30 kilometers per hour speed only, and despite the assignment plan, but was unable to meet demand for travel across the River, all of which road network development with a bridge over the River, hence there is the need to accelerate. Perform theBoth these The Transport Ministry has studies to build a bridge across the River in accordance with network rail and road links, transport integration. Supports the direction of future city growth, the traffic system, the plan is good and there is a good public transport system in the future, then it would have to limit the amount of cars entering the city to solve the traffic problem, the plan is expected. It will be completed in the end of this year and is expected to be visible within the next 5 years.And education prepared plan for bridge across the Chao Phraya River in Bangkok and its vicinity have been assigned to the bridge construction project, the Chao Phraya River. Phra Samut Chedi grounds is an important bridge and Samut prakan is located in bridge construction plans.
翻訳されて、しばらくお待ちください..
