1.) preliminary feasibility study, engineering, economic and environmental impact.Project accelerate, expand call Chairman, is 4. Traffic channels. Phase II (Department of highways.)Summary The project feasibility study, engineering, economic and environmental consequences for the basic plan for the development of highways. With the primary objective to plan for the development of the highway performance. Responding to the needs of citizens and to promote the development of the country. Considering the necessity and importance of the project, various highway project is studied and collected. The needs to develop the highway from strategic development country. Strategy for development of infrastructure of the transport strategy Provincial strategy Work plans of relevant agencies in the development of the highway leading through screening of important projects. To bring economic engineering feasibility study and preliminary environmental impact project and prioritize projects with budgets forecasting analysis of the Highway Department to plan the development of highways in the past 10 years (2550 (2007)-2559 (2016)) and operation plan (Action Plan) in the last 5 years (2550 (2007)-2554 (2011)) From the preparation of the plan for the development of the highway within 10 years (2550 (2007)-2559 (2016)) Mileage summary by category and split by region table at 3.1-1 and highway networks in the future. 2559 (2016) The picture at the 3.1-8
翻訳されて、しばらくお待ちください..
